Problems not to be neglected in purchasing concrete pump
Posted On: 29/11/2018 | Posted by: Haomei Concrete Pumps
As a part of the production line of concrete batching plant, concrete pump can not be ignored when you choose it.
Concrete transportation should be compatible with production capacity, pouring capacity, the demand for concrete, and you should take method to shorten transport, reversed transport, intermittent time. Concrete vibrating time test shows that the vibrating time of concrete should be within 2.5h~3.5h. Additionally, you should spare adequate time for pouring and vibrating, so concrete transport time should not be over 1h, and you are not supposed to randomly add water or additives during the transport process. If the intermittent time is too long and the concrete has solidified or lost plasticity, it must be discarded.
Original source: https://www.concrete-pump-cn.com/a/problems-not-to-be-neglected-in-purchasi.html
Tags:
concrete pump,
Previous:
What should pay attention to rental concrete pump
Next:
What are the connection modes of concrete pump