Principle of choosing cement pump machine arrangement scheme

Posted On: 18/05/2017 | Posted by: Haomei Concrete Pumps

Professional concrete pump manufacturers supply principle of choosing cement pump machine arrangement scheme to you for reference,any technology problem or intereast contact us Email:info@haomei.biz freely.
 
1,The distance from the cement pump machine to pouring working surface should be as close as possible, the pipe should be as short as possible.
 
2,The concrete mixture delivery and material feeding should be convenient, the effect on the concrete quality should be small.
 
3,There should be convenient, safe and reliable power supply and water source, and convenient drainage.
 
4, The environment should be safe.
 
5, Be convenient for installing and maintaining concrete pump and delivery pipe.
 
6, The climatic effect is relatively small.
 
7,The mutual interference with other machines and artificial construction operation is small.
 

Original source: https://www.concrete-pump-cn.com/a/principle-of-choosing-cement-pump-machin.html

Tags: cement pump machine,   concrete p,  

Previous: Arrangement of trailer concrete pump delivery pipe

Next: The ending work of pumping concrete